New Build Walkthrough in Austin: What to Check and When

How to run a new build walkthrough in Austin: the inspection stages, a room-by-room checklist, drainage and warranty checks, and how to do it from out of state.

New Build Walkthrough in Austin: What to Check and When

Buyer checking a new home's interior door

A new build walkthrough in Austin is not one visit. It is a series of checkpoints, from the framing stage to the final look before closing, and the last one only works if you have the paperwork, the approved plans and a plan for drainage in hand. The builder’s walkthrough is a handover meeting. Your job is to turn it into a documented inspection with a punch list the builder has to close out.

This guide covers what the City of Austin inspects and what it does not, the stages worth seeing, a room-by-room checklist, the Central Texas issues that catch buyers off guard, and how to do all of it if you live in another state.

Mogavero Group
mogaverogroup.com
Navigate Your Austin New Build
Mogavero Group offers personalized guidance for Austin buyers, with over 20 years of experience and insight into the local housing market.
Explore buyer guidance

TL;DR

  • The City’s inspections check code and approved plans. They are not a quality audit of your finishes, so you still need your own inspector and your own punch list.
  • Walk the home at more than one stage if you can. The final walkthrough only shows what is visible once the walls are closed.
  • In Austin, treat drainage as a structural item. Check grading, swales and downspouts, and photograph them before landscaping changes the site.
  • Before closing, get the manuals, appliance model and serial numbers, warranty contacts and the claim process in writing.
  • Out of state? Use the approved plans, your selections sheet and time-stamped, room-by-room photos so a remote review is possible.

Table of Contents

What the City inspects, and what it does not

Austin’s Building Inspection Division inspects new construction, remodels and trades such as electrical, mechanical and plumbing to confirm compliance with applicable building codes. The contractor schedules those inspections, and they verify the work against approved plans. That is a different question from “is this house finished the way I was promised?”

A successful final inspection can lead to a Certificate of Occupancy, the document confirming a structure is habitable for its legal use. Austin has required one for residential buildings since 1931. It tells you the house meets code. It does not tell you the paint is clean, the cabinet doors align, the tile is level or the appliances are the ones you selected.

Fire review is a separate track. Austin Fire says technical fire inspections are required for new construction and must be passed before occupancy. Ask your builder to confirm in writing that any required fire-related approvals are complete, rather than assuming it.

Temporary certificates are not completion

Some homes close with a Temporary Certificate of Occupancy. A TCO means the structure can be occupied under conditions, not that everything is done. The City’s TCO process document says a structure needs a TCO or CO before it is occupied or stocked with furniture or materials, and it describes a $750 nonrefundable fee for doing so early. That document is dated May 2015, so confirm the current rule with Austin Development Services before you move a single box.

If your home has a TCO, ask three things: what remains open, who is responsible for each item, and when the final CO is expected. Get the answers in the closing file.

The stages worth walking

Austin’s inspection sequence for residential work includes foundation, framing, insulation, wallboard, electrical, mechanical and plumbing. You do not need to attend every one, but a phase-based approach beats relying on the final walkthrough alone, because most of those systems are hidden once the drywall goes up.

Stage What you or your inspector can see Why it matters
Before the slab pour Forms, steel placement, plumbing rough-in under the slab, grade around the lot Nothing about the foundation is visible later
Framing, before insulation Structure, window and door openings, mechanical and electrical rough-in Last chance to confirm layout and outlet placement against plans
Insulation, before wallboard Coverage, gaps, sealed penetrations Energy performance and comfort depend on it
Pre-drywall or pre-final Finishes underway, fixtures staged Time to flag selection errors while they are cheap to fix
Final walkthrough Completed house, working systems Punch list leverage before you close

Your builder’s contract controls whether you have access to the site during construction, so ask early. Many builders limit visits for safety and insurance reasons and will arrange scheduled stops instead. Either way, ask for photos at each stage, with dates.

Before you walk in: the documents to carry

The most effective buyers arrive with paper. Austin advises that current approved plans and required documentation be accessible during inspections, which makes plan-to-built verification a practical habit for you too. Bring:

  • The approved plan set, and any change orders
  • Your signed selections: flooring, tile, fixtures, hardware, paint colors, countertops
  • The appliance schedule with brands and models
  • The contract’s completion and warranty language
  • A blank punch list, or a spreadsheet with a column for room, item, photo reference and status

If the house is a luxury or semi-custom build, the selections sheet is usually where discrepancies hide. A backsplash tile swapped for a “similar” one, a plumbing fixture in the wrong finish or a different range hood are all easy to miss without the list in your hand.

The room-by-room checklist

Go in daylight, with all lights off first, then on. Open every door, window and cabinet. Run every faucet. Carry a phone for photos, a small level, a flashlight and painter’s tape for marking defects.

Exterior and lot

  • Walk the full perimeter. Look at the grade: soil should slope away from the house.
  • Trace each downspout. Does it discharge well away from the slab, or onto a flat spot against the foundation?
  • Look at swales and low spots where water could pool after rain.
  • Check irrigation heads for overspray against walls or the foundation edge.
  • Inspect masonry, stucco and siding for cracks, gaps and uneven mortar. Note brick ledges and the clearance between soil and the slab edge.
  • Check the garage door, driveway joints and the meter and equipment locations.

Interior structure and finishes

  • Look down walls from the corner with a flashlight held flat to reveal drywall waves and poor taping.
  • Open and close every interior door. Each should latch without rubbing.
  • Check floors for squeaks, lippage between tiles, gaps in wood planks and scratches.
  • Inspect trim joints, paint cut-lines and caulking at tubs, showers and countertops.
  • Test windows for smooth operation and locks that engage fully.

Kitchen and baths

  • Run every appliance through a cycle. Confirm they match your appliance schedule.
  • Fill sinks and tubs, then drain them. Look underneath for drips.
  • Check hot water at each fixture and note how long it takes to arrive.
  • Test exhaust fans and confirm they vent outside.
  • Look at grout lines and shower pans, and check glass for chips.

Systems

  • Switch every light and test every outlet. A cheap outlet tester is worth carrying.
  • Run heating and cooling, and check that each room gets airflow. Locate the filter and know its size.
  • Find the electrical panel, water shutoff and gas shutoff. Make sure circuits are labeled.
  • Test smoke and carbon monoxide alarms.
  • Try any smart-home, security or low-voltage features and confirm you have the logins.

Mark each defect with tape, photograph it with the tape in frame, and log it with its exact location, for example “primary bath, left vanity, second drawer.” Precise locations are what make a punch list enforceable.

Drainage and soil: the Central Texas item

Much of Central Texas sits on clay-rich soils that move. The Texas Department of Licensing and Regulation explains that expansive soils shrink and swell as moisture changes, that builders must ensure water drains away from the house, and that homeowners need to understand how drainage changes can cause damage. The soil-classification thresholds in that guidance are technical lab tests, not something you can judge by eye. What you can judge is whether water has somewhere to go.

On walkthrough day, look for:

  1. Final grade sloping away from the slab on every side
  2. Downspout extensions or underground drains that carry water away
  3. Swales that are continuous and not blocked by a fence, planter or pile of fill
  4. Irrigation that does not soak the foundation edge
  5. Visible cracks in slab edges or masonry, with their location and width noted

Photograph all of it before landscaping changes the site. Those photos are useful evidence of the original conditions if a question arises later. After closing, follow the builder’s foundation-maintenance instructions and keep moisture around the house consistent, instead of only patching cracks you can see.

A caution on what a walkthrough can prove. The Texas Real Estate Commission’s 2025 foundation guidance for inspectors separates visible and present indications from hidden or concealed conditions. A clean visual pass is not a guarantee. If you see serious or recurring signs, such as stair-step cracking, doors that stick across multiple rooms or widening gaps, ask a qualified structural or foundation professional to evaluate.

Stair-step crack in a home's brick exterior

Hire your own inspector

The builder runs its own punch list, and the City verifies code. Neither is working only for you. A licensed independent inspector, ideally one who does new construction and can also attend a pre-drywall stage, fills that gap. We keep a current look at home inspection options in Austin if you need a starting point.

Schedule the inspection before the builder’s formal walkthrough, not after, so that your findings go onto the list the builder is already working from. Ask for the report with photos, then convert it into one consolidated punch list. Request written confirmation of when each item will be fixed, and a follow-up visit to check the work before you close, or before the final payment if your contract allows.

Independent inspection through punch-list follow-up

Warranty paperwork before you sign

A new home should arrive with a homeowner’s manual and applicable manufacturer, retailer and appliance warranties. TDLR’s buyer guidance stresses understanding how to obtain warranty service and maintaining the home and appliances so warranty rights are not compromised. It is written for industrialized housing, but the habit applies to any new home: collect the paper.

Before closing, get:

  • The builder’s warranty document, with exclusions and the claim method
  • Manuals, model numbers and serial numbers for every appliance and system
  • Warranty contacts and the maintenance schedule
  • The process for submitting a claim, and any deadlines

Do not confuse a purchased “home warranty” with the builder’s warranty. TDLR says residential service contracts cover selected appliances and systems and are optional, and they are separate from builder warranties on new construction. Our write-up on what Texas law requires for new home warranties goes deeper.

Doing it from out of state

Plenty of our buyers are relocating and cannot be on site every week. A remote walkthrough can work if you set it up properly:

  1. Send the plans, selections and appliance schedule to your inspector and your agent ahead of time.
  2. Ask the builder for dated photos at each inspection stage, with wide shots and close-ups of each room.
  3. Book your independent inspection for the final walkthrough day and join by video if you cannot attend.
  4. Request a room-by-room photo set with exact locations, not a general “looks good” summary.
  5. Hold the closing until the punch list is verified, or negotiate a written completion agreement for any remaining items.

If you are buying across borders or without US credit history, our guide for international buyers relocating to Austin covers the financing side.

Our perspective

We come at new construction with an architectural eye. Mike Mogavero has more than 20 years in Austin real estate, and we pair that with an architectural background when we evaluate a property. On a new build, that means we read the plans before we read the finishes. The finish level of a house is often decided on paper months before you see it, and the walkthrough is your only chance to check that paper became reality.

Three things we tell every new construction buyer. First, the walkthrough is leverage, so use it before closing, not after. Second, get everything in writing, including verbal promises about landscaping, fencing or delayed items. Third, do not let a polished model home or a staged finish set your expectations for the house you are actually buying. Compare against the contract.

We also see a lot of luxury new construction in the central neighborhoods, where lot constraints, mature trees and drainage add complexity. If that is your market, our pieces on luxury new construction in Tarrytown, Rollingwood and West Lake Hills and new construction in Tarrytown are worth reading before you tour.

— Mike

Working with a buyer’s agent on a new build

The builder’s sales representative works for the builder. If you are buying new construction, you can bring your own representation, and it helps to do so before your first visit, since many builders set terms around registering a buyer’s agent early. Our buyer representation covers the home search, negotiation, and the walkthrough and punch-list process through closing. We also give clients access to private and pre-construction listings that are not on the open market.

If you want to see how the whole path fits together, start with our home buying process workflow for Austin.

Walkthrough day: a short timeline

  • A week before: Confirm the CO or TCO status and the fire approval in writing. Book your inspector.
  • Two to three days before: Re-read the selections sheet and appliance schedule. Prepare the punch-list template.
  • Walkthrough day: Go in daylight, take photos of everything, record exact locations, and do not sign off on completion until you have reviewed the list.
  • Within a few days: Send one consolidated punch list to the builder and ask for written dates.
  • Before closing: Re-verify the fixes, collect all manuals and warranty documents, and photograph the final condition.

FAQ

Is the builder’s walkthrough the same as a city inspection?

No. The City of Austin inspects for code compliance and approved plans, and the contractor schedules those inspections. The builder’s walkthrough is a handover and punch-list review. Neither replaces an independent inspection that looks at workmanship and whether your selections were delivered.

When should I do a new build walkthrough in Austin?

Ideally at several stages: before the slab pour, at framing before insulation, before drywall, and at the final walkthrough before closing. If the builder limits site access, ask for dated photos at each stage and book your independent inspection for the final visit.

What should I do about drainage and foundation concerns?

Check that the grade slopes away from the house, downspouts discharge away from the slab and swales run clear. Photograph it all before landscaping. If you see serious or recurring signs of movement, ask a qualified structural or foundation professional to evaluate, since a visual walkthrough cannot reveal hidden conditions.

Does a home warranty replace the builder’s warranty?

No. A residential service contract is an optional product covering selected appliances and systems, and the builder’s warranty on a new home is separate. Get the builder’s actual warranty, its exclusions and its claim process in writing before closing.

Can I handle a walkthrough if I live out of state?

Yes, with preparation. Share the plans and selections with your inspector and agent, request dated room-by-room photos, and join the final inspection by video. Hold the closing until the punch list is verified or covered by a written completion agreement.

Sources

MMogavero Group
Questions About Your New Build?
Talk with Mogavero Group about navigating the Austin housing market and finding a home that fits your needs.

Recommended

By Mike Mogavero · Mogavero Group at Compass

Browse all articles